Researchers submit AI workloads to NVIDIA Run:ai. To control how resources are allocated and prioritized across teams and initiatives, NVIDIA Run:ai uses Projects as the primary organization management unit. Projects allow administrators to define resource quotas, scheduling behavior, access controls, and policy enforcement, while logically separating workloads between different organizational efforts.

A project can represent a team, an individual user, or a specific initiative, and can be assigned dedicated GPU and CPU quotas, scheduling rules, and permissions. Projects can also be grouped into departments to reflect the organizational hierarchy and enable centralized resource governance.

For example, a team working on a face-recognition initiative might collaborate under a shared project named face-recognition-2024. Alternatively, each team member can be assigned an individual project with a personal resource quota to ensure predictable and isolated resource usage.

Projects Table

The Projects table can be found under Organization in the NVIDIA Run:ai platform.

The Projects table provides a list of all projects defined for a specific cluster, and allows you to manage them. You can switch between clusters by selecting your cluster using the filter at the top.

The Projects table consists of the following columns:

Column
Description

Project

The name of the project

Description

A description of the project

Department

The name of the parent department. Several projects may be grouped under a department.

Cluster

The cluster that the project is associated with

Status

The Project creation status. Projects are manifested as Kubernetes namespaces. The project status represents the Namespace creation status.

Node pool(s)

The node pools associated with the project. By default, a new project is associated with all node pools within its associated cluster. Administrators can change the node pools’ quota parameters for a project. Click the values under this column to view the list of node pools with their parameters (as described below).

Subject(s)

The users, SSO groups, or service accounts with access to the project. Click the values under this column to view the list of subjects with their parameters (as described below). This column is only viewable if your role in the NVIDIA Run:ai platform allows you those permissions.

GPU quota

The GPU quota allocated to the project. This number represents the sum of all node pools’ GPU quota allocated to this project.

Allocated GPUs

The total number of GPUs allocated by successfully scheduled workloads under this project

Avg. GPU allocation

The average number of GPU devices allocated by workloads submitted within this project, based on the selected time range

Avg. GPU utilization

The average percentage of GPU utilization across all workloads submitted within this project, based on the selected time range

Avg. GPU memory utilization

The average percentage of GPU memory usage across all workloads submitted within this project, based on the selected time range

Allocated CPUs (Core)

The total number of CPU cores allocated by workloads submitted within this project. (This column is only available if the CPU Quota setting is enabled, as described below).

Allocated CPU Memory

The total number of CPUs allocated by successfully scheduled workloads under this project. (This column is only available if the CPU Quota setting is enabled, as described below).

GPU allocation ratio

The ratio of Allocated GPUs to GPU quota. This number reflects how well the project’s GPU quota is utilized by its descendent workloads. A number higher than 100% indicates the project is using over quota GPUs.

CPU allocation ratio

The ratio of Allocated CPUs (cores) to CPU quota (cores). This number reflects how much the project’s ‘CPU quota’ is utilized by its descendent workloads. A number higher than 100% indicates the project is using over quota CPU cores.

CPU memory allocation ratio

The ratio of Allocated CPU memory to CPU memory quota. This number reflects how well the project’s ‘CPU memory quota’ is utilized by its descendent workloads. A number higher than 100% indicates the project is using over quota CPU memory.

CPU quota (Cores)

CPU quota allocated to this project. (This column is only available if the CPU Quota setting is enabled, as described below). This number represents the sum of all node pools’ CPU quota allocated to this project. The ‘unlimited’ value means the CPU (cores) quota is not bounded and workloads using this project can use as many CPU (cores) resources as they need (if available).

CPU memory quota

CPU memory quota allocated to this project. (This column is only available if the CPU Quota setting is enabled, as described below). This number represents the sum of all node pools’ CPU memory quota allocated to this project. The ‘unlimited’ value means the CPU memory quota is not bounded and workloads using this Project can use as much CPU memory resources as they need (if available).

Node type (affinity) - Training

The list of NVIDIA Run:ai node-affinities. Any training workload submitted within this project must specify one of those NVIDIA Run:ai node affinities, otherwise it is not submitted.

Node type (affinity) - Workspaces

The list of NVIDIA Run:ai node-affinities. Any interactive (workspace) workload submitted within this project must specify one of those NVIDIA Run:ai node affinities, otherwise it is not submitted.

Idle GPU time limit - Training

The time in days:hours:minutes after which the project stops a training workload not using its allocated GPU resources.

Idle GPU time limit - preemptible workspaces

The time in days:hours:minutes after which the project stops a preemptible interactive (workspace) workload not using its allocated GPU resources.

Idle GPU time limit - non preemptible workloads

The time in days:hours:minutes after which the project stops a non-preemptible interactive (workspace) workload not using its allocated GPU resources..

Training time limit

The duration in days:hours:minutes after which the project stops a training workload

Workspace time limit

The duration in days:hours:minutes after which the project stops an interactive (workspace) workload

Creation time

The timestamp for when the project was created

Workload(s)

The list of workloads associated with the project. Click the values under this column to view the list of workloads with their resource parameters (as described below).

Node Pools with Quota Associated with the Project

Click one of the values of Node pool(s) with quota column, to view the list of node pools and their parameters.

Column
Description

Node pool

The name of the node pool is given by the administrator during node pool creation. All clusters have a default node pool created automatically by the system and named ‘default’.

Order of priority

The default order in which the Scheduler uses node pools to schedule a workload. This is used only if the order of priority of node pools is not set in the workload during submission, either by an admin policy or the user. An empty value means the node pool is not part of the project’s default list, but can still be chosen by an admin policy or the user during workload submission

GPU quota

The amount of GPU quota the administrator dedicated to the project for this node pool (floating number, e.g. 2.3 means 230% of GPU capacity).

Project Rank

The project's scheduling rank compared to other projects in the same department and same node pool

Over-quota weight

Represents the relative weight used to calculate the amount of non-guaranteed overage resources a project can get on top of its quota in this node pool. Unused resources are split between projects that require the use of overage resources.

Max GPU devices allocation

Represents the maximum GPU device allocation the project can get from this node pool - the maximum sum of quota and over-quota GPUs.

CPU (Cores)

The amount of CPUs (cores) quota the administrator has dedicated to the project for this node pool (floating number, e.g. 1.3 Cores = 1300 mili-cores). The ‘unlimited’ value means the CPU (Cores) quota is not bounded and workloads using this node pool can use as many CPU (Cores) resources as they require, (if available).

CPU memory

The amount of CPU memory quota the administrator has dedicated to the project for this node pool (floating number, in MB or GB). The ‘unlimited’ value means the CPU memory quota is not bounded and workloads using this node pool can use as much CPU memory resource as they need (if available).

Allocated GPUs

The actual amount of GPUs allocated by workloads using this node pool under this project. The number of allocated GPUs may temporarily surpass the GPU quota if over quota is used.

Allocated CPU (Cores)

The actual amount of CPUs (cores) allocated by workloads using this node pool under this project. The number of allocated CPUs (cores) may temporarily surpass the CPUs (Cores) quota if over quota is used.

Allocated CPU memory

The actual amount of CPU memory allocated by workloads using this node pool under this Project. The number of Allocated CPU memory may temporarily surpass the CPU memory quota if over quota is used.

Subjects Authorized for the Project

Click one of the values in the Subject(s) column, to view the list of subjects and their parameters. This column is only viewable, if your role in the NVIDIA Run:ai system affords you those permissions.

Column
Description

Subject

A user, SSO group, or service account assigned with a role in the scope of this Project

Type

The type of subject assigned to the access rule (user, SSO group, or service account)

Scope

The scope of this project in the organizational tree. Click the name of the scope to view the organizational tree diagram, you can only view the parts of the organizational tree for which you have permission to view.

Role

The role assigned to the subject, in this project’s scope

Authorized by

The user who granted the access rule

Last updated

The last time the access rule was updated

Workloads Associated with the Project

Click one of the values of Workload(s) column, to view the list of workloads and their parameters

Column
Description

Workload

The name of the workload, given during its submission. Optionally, an icon describing the type of workload is also visible

Type

The type of the workload, e.g. Workspace, Training, Inference

Status

The state of the workload and time elapsed since the last status change

Created by

The subject that created this workload

Running/ requested pods

The number of running pods out of the number of requested pods for this workload. e.g. a distributed workload requesting 4 pods but may be in a state where only 2 are running and 2 are pending

Creation time

The date and time the workload was created

GPU compute request

The amount of GPU compute requested (floating number, represents either a portion of the GPU compute, or the number of whole GPUs requested)

GPU memory request

The amount of GPU memory requested (floating number, can either be presented as a portion of the GPU memory, an absolute memory size in MB or GB, or a MIG profile)

CPU memory request

The amount of CPU memory requested (floating number, presented as an absolute memory size in MB or GB)

CPU compute request

The amount of CPU compute requested (floating number, represents the number of requested Cores)

Customizing the Table View

  • Filter - Click ADD FILTER, select the column to filter by, and enter the filter values

  • Search - Click SEARCH and type the value to search by

  • Sort - Click each column header to sort by

  • Column selection - Click COLUMNS and select the columns to display in the table

  • Download table - Click MORE and then Click Download as CSV. Export to CSV is limited to 20,000 rows.

Adding a New Project

  1. Click +NEW PROJECT

  2. Select a scope. Choose the department or organizational scope under which the project will be created. You can view and select only the clusters for which your assigned roles grant you permission.

  3. Enter a name for the project. Project names must start with a letter and can only contain lower case Latin letters, numbers or a hyphen ('-’).

  4. Namespace associated with the project. Each project is mapped to a Kubernetes namespace in the cluster. All workloads created under this project run in that namespace.

    • By default, NVIDIA Run:ai creates a new namespace in the Kubernetes cluster using the project's name with the run:ai prefix (runai-<project-name>).

    • Alternatively, you can use an existing namespace from the cluster. You must associate this namespace with the new project using the provided kubectl command. Copy the command shown in the UI and run it in your terminal to complete the association.

  5. Choose how to proceed:

    • Click CREATE PROJECT & CLOSE to create the project without assigning resources.

    • Click CREATE PROJECT & CONTINUE to set dedicated resources and scheduling guarantees.

    circle-info

    Note

    • The project is created and appears in the Projects grid.

    • When you select CREATE PROJECT & CLOSE, the project is created without assigned resources. The project’s quota is set to 0, which means workloads can run only when spare GPUs are available. The following default settings are applied:

      • The project is created with a Medium Low rank.

      • Over quota weight is always applied when distributing over-quota GPUs among projects in the same rank. By default, the project’s weight is derived proportionally from its assigned GPU quota. Since the quota is set to 0, the effective weight is 0. If Over quota weight is enabled via General settings, the project is assigned a default weight of 2.

Assigning GPU Quota

Assign GPUs to the project and define how the Scheduler prioritizes node pools when running the project’s workloads.

  1. Review the node pools available to the project. By default, a project inherits the node pools defined at the department level. This represents the default (suggested) configuration set by the department and can be changed per project by selecting which node pools are available and adjusting their order.

  2. Add node pools and set the default order in which workloads will be scheduled to use them. The leftmost node pool is the first one workloads will attempt to schedule onto. The Scheduler first tries to allocate resources using the highest priority node pool, then the next in priority, until it reaches the lowest priority node pool list, then the Scheduler starts from the highest again.

    circle-info

    Note

    • When no node pools are configured, you can assign quota for the whole project, instead of per node pool. After node pools are created, you can assign quota for each node pool separately.

    • The order of node pools can be overridden during workload submission by an admin policy or by the user.

  3. Review the department's GPU quota per node pool:

    • Unassigned - The number of GPUs not assigned as quota to subordinate projects.

    • Total - The total number of GPUs assigned to the department in this node pool.

  4. Set the project's GPU quota in the selected node pool. A Quota distribution graph next to the project shows how GPUs are distributed across the department for that node pool. The graph reflects:

    • Assigned quota - The number of GPUs from the node pool that are assigned to this project.

    • Unassigned quota - The number of GPUs still available in the node pool that are not yet assigned for any project.

    • Sum of other projects’ assigned quota - The total number of GPUs already assigned to all other projects in the same node pool.

      circle-info

      Note

      • If the department’s quota is set to Unlimited, projects under that department can consume available GPUs up to the physical capacity of the node pool or cluster.

      • If the department’s quota is limited, project behavior depends on whether the Limit projects from exceeding department quota is enabled/disabled via General settings:

        • If disabled, projects can be assigned a GPU quota that exceeds the department quota. In this case, the system may display warnings, but the department quota is not enforced.

        • If enabled, the project’s assigned GPU quota must remain within the department quota. You cannot assign more GPUs than the department has available.

      • Setting a quota to 0 (GPU, CPU, or CPU memory) and disabling Over quota weight via General settings, means the project is blocked from using those resources on this node pool.

  5. You can adjust other projects' quotas to free up additional resources. A table lists all projects and their assigned GPU quotas. Updating these values redistributes the department’s assigned and unassigned GPU quota across projects for the selected node pool, as reflected in the Quota distribution graph next to each project:

    • Use the Search icon to find a project

    • Click the GPU quota value and set the number of GPUs

    • Click APPLY

  6. These steps apply to the selected node pool. If multiple node pools are configured, repeat the process for each.

  7. Click SAVE & CONTINUE

Defining GPU Over Quota

Define how workloads can consume GPUs beyond the project’s assigned quota when additional resources are available.

  1. Allow workloads to exceed the project’s quota is enabled by default, allowing workloads in the project to consume GPUs beyond the assigned quota. If disabled, workloads from the project will run only within the assigned quota and will not consume additional GPUs, even if resources are available.

    circle-info

    Note

    Workloads running over quota are opportunistic and may be preempted or stopped at any time when higher priority workloads require resources.

  2. Set the max GPU allocation. This value defines the maximum GPU device allocation the project can get from the node pool, representing the maximum sum of assigned quota and over-quota GPUs:

    • By default, this field is set to Unlimited, allowing the project to consume any available over-quota GPUs

    • Enter a number equal to or above the assigned quota

  3. Rank projects in the order in which their workloads will be scheduled. A project’s rank determines the scheduling priority of its workloads only when competing for over-quota GPUs within the same node pool. By default, projects are assigned a Medium Low rank. Projects with a higher rank are scheduled before projects with a lower rank when over-quota GPUs become available. When multiple projects share the same rank, available over-quota GPUs are distributed according to each project’s weight:

    • Filter the list of projects:

      • Click Add filter

      • Select Rank to filter by rank level, or Project to filter by project name

      • Enter or select the filter criteria and click APPLY

    • Locate and select projects:

      • Locate the project or projects whose rank you want to change

      • Select one or more projects

    • Change the rank:

      • Click MOVE TO RANK

      • In the Move to Rank dialog, select the destination rank

      • Click MOVE <n> PROJECTS

    To learn more about project ranks, see The NVIDIA Run:ai Scheduler: concepts and principles.

  4. Assign weights to determine the projects' share of resources. A project’s weight determines how available over-quota GPUs are distributed between projects that have the same rank within the same node pool. Weight behavior depends on whether Over quota weight is enabled or disabled via General settings. When disabled, the project’s weight is proportional to its assigned GPU quota, displayed for reference, and cannot be edited. When enabled, all projects within the same rank are assigned a default weight of 2, and the value can be adjusted per project:

    • Filter the list of projects:

      • Click Add filter

      • Select Rank to filter by rank level, or Project to filter by project name

      • Enter or select the filter criteria and click APPLY

    • Review weight distribution:

      • Projects are grouped by rank

      • For each project, the Weight distribution graph shows:

        • The project’s weight

        • The total weight of other projects in the same rank

    • Edit the project’s weight (when Over quota weight is enabled):

      • Click the Weight value for the project and enter a value

      • Click APPLY

  5. These steps apply to the selected node pool. If multiple node pools are configured, repeat the process for each.

  6. Click SAVE & CONTINUE

Assigning CPU Quota

Assign CPU resources (cores and memory) to the project and define the maximum CPU usage per node pool. This form is displayed only if CPU quota is enabled via the General settings.

  1. Set the number of CPU (Cores) the project can use in the selected node pool. By default, CPU cores are set to Unlimited, allowing the project to consume any available CPU resources in the node pool. Enter a number.

  2. Set the amount of CPU memory available to the project in the selected node pool. By default, CPU memory is set to Unlimited, allowing the project to consume any available CPU resources in the node pool. Enter a number and select a unit (MB, MiB, or GB).

    circle-info

    Note

    • If the department’s quota is limited, project behavior depends on whether the Limit projects from exceeding department quota is enabled/disabled via General settings:

      • If disabled, projects can be assigned a CPU quota that exceeds the department quota. In this case, the system may display warnings, but the department quota is not enforced.

      • If enabled, the project’s assigned CPU quota must remain within the department quota. You cannot assign more CPU resources than the department has available.

    • When the CPU quota feature flag is disabled, any previously set CPU quotas for a project are automatically removed.

  3. These steps apply to the selected node pool. If multiple node pools are configured, repeat the process for each.

  4. Click SAVE & CONTINUE

Setting Scheduling Rules

Scheduling rules control how compute resources are used by workloads. The restrict either the resources (nodes) on which workloads can run or the duration of the run time. Scheduling rules are set for projects and apply to specific workload types. By default, projects inherit scheduling rules from their parent department. Project-level scheduling rules can be used to add or override restrictions for workloads in that project. See Scheduling rules for more details.

  1. Click +RULE

  2. Select a rule type from the dropdown:

    • + Idle GPU timeout - Limit the duration of a workload whose GPU is idle

    • + Workload time limit - Set a time limit for workspaces regardless of their activity (e.g., stop the workspace after 1 day of work)

    • + Node type (Affinity) - Limit workloads to run on specific node types

  3. For each rule, select the workload type(s) to which the rule applies and configure the rule parameters

  4. Click SAVE & CONTINUE

Once scheduling rules are set for a project, all matching workloads associated with the project have the restrictions applied to them, as defined, when the workload is submitted. New scheduling rules added to a project are not applied over previously created workloads associated with that project.

circle-info

Note

  • When editing a scheduling rule within a project, you can only tighten rules inherited from the department (for example, by setting a shorter time limit).

  • Scheduling rules defined at the department level cannot be deleted from within a project.

Applying Access Rules

  1. Click +ACCESS RULE

  2. Select a subject - User, SSO group, or Service account

  3. Select or enter the subject identifier. You can define up to 10 subjects of the selected type:

    • User email for a local user created in NVIDIA Run:ai or for SSO user as recognized by the IDP

    • Group name as recognized by the IDP

    • Service account name as created in NVIDIA Run:ai

  4. Select a role

  5. Click SAVE RULE

  6. Click CLOSE

Editing a Project

To edit a project:

  1. Select the project you want to edit

  2. Click EDIT

  3. From the dropdown menu, select the form you want to modify

  4. Update the settings and click SAVE & CONTINUE

circle-info

Note

When editing a project:

  • You can navigate directly to a specific form without completing the full project creation flow again.

  • Changes apply only to the selected form; previously configured settings in other forms remain unchanged.

  • You cannot reduce GPU and CPU quotas below the quotas currently consumed by non-preemptible workloads.

Viewing a Project’s Policy

To view the policy of a project:

  1. Select the project for which you want to view its policies. This option is only active for projects with defined policies in place.

  2. Click VIEW POLICY and select the workload type for which you want to view the policies

  3. In the Policy form, view the workload rules that are enforcing your project for the selected workload type as well as the defaults:

    • Parameter - The workload submission parameter that Rules and Defaults are applied to

    • Type (applicable for data sources only) - The data source type (Git, S3, nfs, pvc etc.)

    • Default - The default value of the Parameter

    • Rule - Set up constraints on workload policy fields

    • Source - The origin of the applied policy (cluster, department or project)

circle-info

Note

The policy affecting the project consists of rules and defaults. Some of these rules and defaults may be derived from policies of a parent cluster and/or department (source). You can see the source of each rule in the policy form.

Deleting a Project

To delete a project:

  1. Select the project you want to delete

  2. Click DELETE

  3. On the dialog, click DELETE to confirm

circle-info

Note

Clusters < v2.20

Deleting a project does not delete its associated namespace, any of the workloads running using this namespace, or the policies defined for this project. However, any assets created in the scope of this project such as compute resources, environments, data sources, templates and credentials, are permanently deleted from the system.

Clusters >=v2.20

Deleting a project does not delete its associated namespace, but will attempt to delete it’s associated workloads and assets. Any assets created in the scope of this project such as compute resources, environments, data sources, templates and credentials, are permanently deleted from the system.

Using CLI

To view the available actions on projects, see the project CLI v2 reference.

Using API

To view the available actions, go to the Projects API reference.

Last updated