Scheduling rules

This article explains the procedure to configure and manage scheduling rules.

Scheduling rules are restrictions applied to workloads. These restrictions apply to either the resources (nodes) on which workloads can run or the duration of the run time. Scheduling rules are set for Projects or Departments and apply to specific workload types. Once scheduling rules are set for a project or department, all matching workloads associated with the project have the restrictions applied to them, as defined, when the workload was submitted. New scheduling rules added to a project are not applied over previously created workloads associated with that project.

There are three types of scheduling rules:

Workload duration (time limit)

This rule limits the duration of a workload run time. Workload run time is calculated as the total time in which the workload was in status Running. You can apply a single rule per workload type - Preemptive Workspaces, Non-preemptive Workspaces, and Training.

Idle GPU time limit

This rule limits the total GPU time of a workload. Workload idle time is counted from the first time the workload is in status Running and the GPU was idle. Idleness is calculated by employing the runai_gpu_idle_seconds_per_workload metric. This metric determines the total duration of zero GPU utilization within each 30-second interval. If the GPU remains idle throughout the 30-second window, 30 seconds are added to the idleness sum; otherwise, the idleness count is reset. You can apply a single rule per workload type - “Preemptible” Workspaces, “Non-preemptible” Workspaces, and Training.

Note

To make Idle GPU timeout effective, it must be set to a shorter duration than the workload duration of the same workload type.

Node type (affinity)

Node type is used to select a group of nodes, typically with specific characteristics such as a hardware feature, storage type, fast networking interconnection, etc. The Scheduler uses node type as an indication of which nodes should be used for your workloads, within this project.

Node type is a label in the form of run.ai/type and a value (e.g. run.ai/type = dgx200) that the administrator uses to tag a set of nodes. Adding the node type to the project’s scheduling rules mandates the user to submit workloads with a node type label/value pairs from this list, according to the workload type - Workspace or Training. The Scheduler then schedules workloads using a node selector, targeting nodes tagged with the NVIDIA Run:ai node type label/value pair. Node pools and a node type can be used in conjunction. For example, specifying a node pool and a smaller group of nodes from that node pool that includes a fast SSD memory or other unique characteristics.

Labelling nodes for node types grouping

The administrator should use a node label with the key of run.ai/type and any coupled value

To assign a label to nodes you want to group, set the ‘node type (affinity)’ on each relevant node:

  1. Obtain the list of nodes and their current labels by copying the following to your terminal:

kubectl get nodes --show-labels
  1. Annotate a specific node with a new label by copying the following to your terminal:

kubectl label node <node-name> run.ai/type=<value>

Adding a scheduling rule to a project or department

To add a scheduling rule:

  1. Select the project/department for which you want to add a scheduling rule

  2. Click EDIT

  3. In the Scheduling rules section click +RULE

  4. Select the rule type

  5. Select the workload type and time limitation period

  6. For Node type, choose one or more labels for the desired nodes

  7. Click SAVE

Note

You can review the defined rules in the Projects table in the relevant column.

Editing the scheduling rule

To edit a scheduling rule:

  1. Select the project/department for which you want to edit its scheduling rule

  2. Click EDIT

  3. Find the scheduling rule you would like to edit

  4. Edit the rule

  5. Click SAVE

Note

Setting scheduling rules in a department enforces the rules on all associated projects.

Editing a scheduling rule within a project - you can only tighten a rule applied by your department admin, meaning set a lower time limitation not higher.

Deleting the scheduling rule

To delete a scheduling rule:

  1. Select the project/department from which you want to delete a scheduling rule

  2. Click EDIT

  3. Find the scheduling rule you would like to delete

  4. Click on the x icon

  5. Click SAVE

Note

Deleting a department rule within a project - a project admin cannot delete a rule created by the department admin.

Using API

Go to the Projects API reference to view the available actions